Task (Exercises / Task)
Table of Contents
Video & Sound Production Project 2 Video Shooting & Editing
Instructions
Module Information Booklet
Figure 1.1 Module Information Booklet. (Week 1 22.04.2025)
Exercise
Shooting & Editing - Lalin
Week 2 (27.04.2025)
Task
-
Last page of Week 2 slides: VSP Framing & Storyboard.pptx
-
Download the footage:
Google Drive Link
-
View the Original video:
YouTube Link
-
Watch the Editing tutorial video:
Tutorial Video
-
Lalin final cut: Edit to 35 seconds sharp.
-
Document the process under Project 2 section.
Process Editing Lalin
Figure 2.1 Process Editing Lalin #Captions and Graphics. (Week 2 27.04.2025)
Process Editing Lalin
Figure 2.2 Process Editing Lalin #Colour Adjustment. (Week 2 27.04.2025)
Week 3 (05.05.2025)
Outcome
Figure 2.3 Outcome of Lalin #Colour Adjustment. (Week 3 05.05.2025)
Shooting & Editing - Everywhere Everyone All At Once
Week 5 (21.05.2025)
Pre-production
Team shooting practise:
https://docs.google.com/presentation/d/1TVO9E-2dwQ2ptHQdJ38yZofJO3CFwCklUgzEwyg1uk0/edit?slide=id.p#slide=id.p
Position Name List:
Figure 2.4 Position Name List. (Week 5 21.05.2025)
Production Task List:
Figure 2.5 Production Task List. (Week 5 21.05.2025)
Week 5 (21.05.2025)
Production
Storyboard Practice
-
Storyboard Practice Slide:
Google Slides Link
-
Video Clips & Storyboard:
Google Drive Folder
-
Recorded Videos & Audios:
Google Drive Folder
Week 7 (07.06.2025)
Post-production
Figure 2.6 Post-production. (Week 7 07.06.2025)
Shooting for Project 2
We shoot for Project 2 based on the plan we discussed last week.
Outcome Trailer
Figure 2.7 Outcome Trailer. (Week 7 08.06.2025)
Reflections
Experience
I had a lot of fun acting as Evelyn in our remake of Everything Everywhere All At Once. It was exciting to be both in front of the camera and involved behind the scenes. The shooting process taught me a lot about teamwork, especially when handling lighting and sound setups. Editing the trailer was also very enjoyable, especially adding music, sound effects, and adjusting colours to bring everything together.
Observation
I noticed how different lighting setups can drastically change the emotion and focus of a shot. Sound recording also requires precision—sometimes background noise or mic placement can affect clarity. During editing, balancing audio levels and matching cuts with music timing made a big difference in the trailer’s impact. Using visuals and sound in sync made the Lalin edit feel more polished and immersive.
Findings
While working on Exercise 2, I discovered many important aspects of film production, such as how lighting affects the mood of a scene and how sound is captured using a mic. I also learned how to apply colour correction and adjust brightness to make the footage look more cinematic. During editing, I explored how sound effects and background music can enhance storytelling. Through the Lalin exercise, I understood how layering graphics and sound can help build rhythm and mood in a video.
Week 2 (27.04.2025)
Task
- Last page of Week 2 slides: VSP Framing & Storyboard.pptx
- Download the footage: Google Drive Link
- View the Original video: YouTube Link
- Watch the Editing tutorial video: Tutorial Video
- Lalin final cut: Edit to 35 seconds sharp.
- Document the process under Project 2 section.
Process Editing Lalin
Figure 2.1 Process Editing Lalin #Captions and Graphics. (Week 2 27.04.2025)
Process Editing Lalin
Figure 2.2 Process Editing Lalin #Colour Adjustment. (Week 2 27.04.2025)
Week 3 (05.05.2025)
Outcome
Figure 2.3 Outcome of Lalin #Colour Adjustment. (Week 3 05.05.2025)
Shooting & Editing - Everywhere Everyone All At Once
Week 5 (21.05.2025)
Pre-production
Team shooting practise:
https://docs.google.com/presentation/d/1TVO9E-2dwQ2ptHQdJ38yZofJO3CFwCklUgzEwyg1uk0/edit?slide=id.p#slide=id.p
Position Name List:
Figure 2.4 Position Name List. (Week 5 21.05.2025)
Production Task List:
Figure 2.5 Production Task List. (Week 5 21.05.2025)
Week 5 (21.05.2025)
Production
Storyboard Practice
-
Storyboard Practice Slide:
Google Slides Link
-
Video Clips & Storyboard:
Google Drive Folder
-
Recorded Videos & Audios:
Google Drive Folder
Week 7 (07.06.2025)
Post-production
Figure 2.6 Post-production. (Week 7 07.06.2025)
Shooting for Project 2
We shoot for Project 2 based on the plan we discussed last week.
Outcome Trailer
Figure 2.7 Outcome Trailer. (Week 7 08.06.2025)
Reflections
Experience
I had a lot of fun acting as Evelyn in our remake of Everything Everywhere All At Once. It was exciting to be both in front of the camera and involved behind the scenes. The shooting process taught me a lot about teamwork, especially when handling lighting and sound setups. Editing the trailer was also very enjoyable, especially adding music, sound effects, and adjusting colours to bring everything together.
Observation
I noticed how different lighting setups can drastically change the emotion and focus of a shot. Sound recording also requires precision—sometimes background noise or mic placement can affect clarity. During editing, balancing audio levels and matching cuts with music timing made a big difference in the trailer’s impact. Using visuals and sound in sync made the Lalin edit feel more polished and immersive.
Findings
While working on Exercise 2, I discovered many important aspects of film production, such as how lighting affects the mood of a scene and how sound is captured using a mic. I also learned how to apply colour correction and adjust brightness to make the footage look more cinematic. During editing, I explored how sound effects and background music can enhance storytelling. Through the Lalin exercise, I understood how layering graphics and sound can help build rhythm and mood in a video.
Week 5 (21.05.2025)
Pre-production
Team shooting practise:
https://docs.google.com/presentation/d/1TVO9E-2dwQ2ptHQdJ38yZofJO3CFwCklUgzEwyg1uk0/edit?slide=id.p#slide=id.p
Position Name List:
Figure 2.4 Position Name List. (Week 5 21.05.2025)
Production Task List:
Figure 2.5 Production Task List. (Week 5 21.05.2025)
Team shooting practise:
https://docs.google.com/presentation/d/1TVO9E-2dwQ2ptHQdJ38yZofJO3CFwCklUgzEwyg1uk0/edit?slide=id.p#slide=id.p
Figure 2.4 Position Name List. (Week 5 21.05.2025)
Figure 2.5 Production Task List. (Week 5 21.05.2025)
Week 5 (21.05.2025)
Production
Storyboard Practice
- Storyboard Practice Slide: Google Slides Link
- Video Clips & Storyboard: Google Drive Folder
- Recorded Videos & Audios: Google Drive Folder
Week 7 (07.06.2025)
Post-production
Figure 2.6 Post-production. (Week 7 07.06.2025)
Shooting for Project 2
We shoot for Project 2 based on the plan we discussed last week.
Outcome Trailer
Figure 2.7 Outcome Trailer. (Week 7 08.06.2025)
Reflections
Experience
I had a lot of fun acting as Evelyn in our remake of Everything Everywhere All At Once. It was exciting to be both in front of the camera and involved behind the scenes. The shooting process taught me a lot about teamwork, especially when handling lighting and sound setups. Editing the trailer was also very enjoyable, especially adding music, sound effects, and adjusting colours to bring everything together.
.png)
Comments
Post a Comment